State-of-the-Art Technology in the Construction of Sea-Crossing Fixed Links with a Bridge, Island, and Tunnel Combination
Author(s): |
Yaojun Ge
Yong Yuan |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, February 2019, n. 1, v. 5 |
Page(s): | 15-21 |
DOI: | 10.1016/j.eng.2019.01.003 |
- About this
data sheet - Reference-ID
10669143 - Published on:
28/05/2022 - Last updated on:
28/05/2022