A stakeholder probability-based optimization approach for cost-effective bridge management under financial constraints
Author(s): |
André D. Orcesi
Dan M. Frangopol |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering Structures, May 2011, n. 5, v. 33 |
Page(s): | 1439-1449 |
DOI: | 10.1016/j.engstruct.2010.12.035 |
- About this
data sheet - Reference-ID
10552764 - Published on:
21/01/2021 - Last updated on:
19/02/2021