0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Stakeholder Perception Management of the Crisis at the Samanalawewa Hydro Power Station of Ceylon Electricity Board

Author(s):
Medium: journal article
Language(s): English
Published in: Engineer: Journal of the Institution of Engineers, Sri Lanka, , n. 4, v. 48
Page(s): 59
DOI: 10.4038/engineer.v48i4.6881

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.4038/engineer.v48i4.6881.
  • About this
    data sheet
  • Reference-ID
    10410867
  • Published on:
    12/02/2020
  • Last updated on:
    12/02/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine