Stability Analysis of Slope and Diversion Water Tunnel of Hydropower Station under Strong Earthquake
Author(s): |
Zhongchang Wang
Bo Li |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Geotechnical and Geological Engineering, 18 November 2020, n. 3, v. 39 |
Page(s): | 2041-2049 |
DOI: | 10.1007/s10706-020-01605-x |
- About this
data sheet - Reference-ID
10673863 - Published on:
12/06/2022 - Last updated on:
12/06/2022