0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

鋼アーチ主構の台船一括架設と長距離圧送によるSQコンクリートの施工─太田川大橋─ (Large-block Erection using Deck Barges for the Arch Main Structures and Construction of Super Quality Concrete by Long Distance Pressure Feed—Otagawa Ohashi Bridge—)

Author(s):



Medium: journal article
Language(s): Japanese
Published in: Concrete Journal (JCI), , n. 6, v. 53
Page(s): 551-557
DOI: 10.3151/coj.53.551
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3151/coj.53.551.
  • About this
    data sheet
  • Reference-ID
    10438086
  • Published on:
    08/10/2020
  • Last updated on:
    08/10/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine