0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Sources of contractor's payment risks and cash flow problems in the New Zealand construction industry: project team's perceptions of the risks and mitigation measures

Author(s):
Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 10, v. 29
Page(s): 1027-1041
DOI: 10.1080/01446193.2011.623708

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446193.2011.623708.
  • About this
    data sheet
  • Reference-ID
    10211854
  • Published on:
    05/12/2018
  • Last updated on:
    19/02/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine