0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Solution Suggesting Application Model to Minimize Delays and Cost Overrun for Low to Midrise Building Construction in Pampanga

Author(s):

Medium: journal article
Language(s): English
Published in: Civil Engineering and Architecture, , n. 6, v. 9
Page(s): 1920-1937
DOI: 10.13189/cea.2021.090623
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.13189/cea.2021.090623.
  • About this
    data sheet
  • Reference-ID
    10639498
  • Published on:
    30/11/2021
  • Last updated on:
    30/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine