Sixty years of project planning: history and future

Author(s):

Medium: journal article
Language(s): English
Published in: Organization, Technology and Management in Construction, , n. 1, v. 8
Page(s): 1499-1510
DOI: 10.1515/otmcj-2016-0013
Abstract:

Modern project management owes its reputation to the development of modern scheduling techniques based on the theory of graphs, namely, network scheduling techniques. In 2017, these techniques are celebrating their 60th birthday. This anniversary provides the opportunity to look back at the most important achievements such as non-linear activities and new precedence relations, as well as to take a look into the future. The highlights of this subjective retrospective are the presentation of the latest results and the compilation of those problems that will probably define the priorities for future research. This paper is the extended version of the keynote lecture/ presentation that has been presented at the PBE 2016 Conference (People, Buildings and Environment, Luhačovice, Czech Republic) (Hajdu 2016a).

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1515/otmcj-2016-0013.
  • About this
    data sheet
  • Reference-ID
    10411613
  • Published on:
    12/02/2020
  • Last updated on:
    24/07/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine