0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Single stage concrete pumping through 2.432km (1.51 miles): Weather and execution challenges

Author(s):

Medium: journal article
Language(s): English
Published in: Case Studies in Construction Materials, , v. 3
Page(s): 56-69
DOI: 10.1016/j.cscm.2015.05.001
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.cscm.2015.05.001.
  • About this
    data sheet
  • Reference-ID
    10577160
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine