文登抽水蓄能电站地下厂房施工仿真分析 (Simulation Analysis of Construction of Underground Plant for Wendeng Pumped Storage Project)
Author(s): |
徐艳群
|
---|---|
Medium: | journal article |
Language(s): | Chinese |
Published in: | Hans Journal of Civil Engineering 的中文名称是土木工程, 2018, n. 2, v. 7 |
Page(s): | 177-182 |
DOI: | 10.12677/hjce.2018.72022 |
Copyright: | © 2018 by authors and Hans Publishers Inc. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
Download full text file (PDF)
0.85 MB
Advertisement
Advertisement
0.85 MB
- About this
data sheet - Reference-ID
10378478 - Published on:
12/11/2019 - Last updated on:
02/06/2021