0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Semi-ideal Bidding Via A Fuzzy Topsis Project Evaluation Framework in Risky Environments

Author(s):

Medium: journal article
Language(s): Latvian
Published in: Journal of Civil Engineering and Management, , v. 19
Page(s): S106-S115
DOI: 10.3846/13923730.2013.801884
Abstract:

Blind involvement in aimless bids may result the loss of bidding bond expenditures, purchased bidding documents, the cost of human resources engaged in mark-up estimation, and detailed project investigation costs such as site visits. In this research, a risk based fuzzy TOPSIS framework is set up to evaluate and prioritize bidding opportunities. This may help contractors to assign their limited resources to near optimal selected projects. The risks inherent in the nature of every tender, makes systematic risk analysis a prerequisite for any construction company. Proposed framework considers key determining risk factors such as corporate considerations, tender environment, contractual issues, and project specific risks. The methodology implementation has been facilitated by developing a graphical user interface that accepts linguistic terms expressed by main decision groups. A case study demonstrates the applicability of the model.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3846/13923730.2013.801884.
  • About this
    data sheet
  • Reference-ID
    10362821
  • Published on:
    12/08/2019
  • Last updated on:
    12/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine