Selection of the General Contractor Using the AHP Method

Author(s):

Medium: journal article
Language(s): English
Published in: Archives of Civil Engineering, , n. 3, v. 62
Page(s): 105-116
DOI: 10.1515/ace-2015-0086
Abstract:

The topic of this paper is the description of the General Contractor Selection procedure using the AHP method. Another aim of this paper - within the scope of decision-making - is the determination of the potential General Contractor’s evaluation criteria and the selection of the best Bidder using the AHP method. We included the description of the conducted tender proceeding for the purpose of the procurement’s subject. As the decision-making options, we adopted four construction companies that submitted their bid. A key element of the studies was the paired comparison of all hierarchical structure elements. We estimated the local weighting coefficients and global priorities of particular decision-making options as well as analysed the vulnerabilities of the obtained results.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1515/ace-2015-0086.
  • About this
    data sheet
  • Reference-ID
    10476839
  • Published on:
    25/11/2020
  • Last updated on:
    25/11/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine