Selection and specification of a tunnel boring machine as the leading factor for the achievement of project goals
Author(s): |
Matthias Flora
Manfred Jäger Peter Teuscher |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Geomechanics and Tunnelling, October 2018, n. 5, v. 11 |
Page(s): | 492-504 |
DOI: | 10.1002/geot.201800044 |
- About this
data sheet - Reference-ID
10084013 - Published on:
09/10/2018 - Last updated on:
18/10/2018