0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Selection and optimization of water filling scheme in front of super-high arch dam

Author(s):




Medium: journal article
Language(s): English
Published in: IOP Conference Series: Earth and Environmental Science, , n. 1, v. 787
Page(s): 012104
DOI: 10.1088/1755-1315/787/1/012104
Abstract:

During the construction of super-high arch dam, the timing of water filling in front of the dam is the key link in the safety management and control of arch dam. Besides the cantilever of dam and the transverse joint aperture of concrete arch dam, the stress in the corridor area at the bottom of the dam should be considered for the timing of water filling in the dam. In this paper, Baihetan super-high arch dam project was taken as an example to study this problem, and the risk of overall dam overhang under gravity load and the influence of different water levels on the transverse joint aperture and stress in the corridor area was systematically analyzed. The research results showed that different water level elevations have obvious influence on the transverse joint aperture and stress state in corridor area, and the selection of water level elevations needs to comprehensively consider the mutual coupling relationship among these influencing factors, so as to realize the effective control of dam safety risk.

License:

This creative work has been published under the Creative Commons Attribution 3.0 Unported (CC-BY 3.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10781126
  • Published on:
    11/05/2024
  • Last updated on:
    05/06/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine