0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Seismic failure mechanism and interaction of the cross tunnel-slope system using Hilbert-Huang transform

Author(s):


Medium: journal article
Language(s): English
Published in: Tunnelling and Underground Space Technology, , v. 131
Page(s): 104820
DOI: 10.1016/j.tust.2022.104820
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.tust.2022.104820.
  • About this
    data sheet
  • Reference-ID
    10696688
  • Published on:
    10/12/2022
  • Last updated on:
    10/12/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine