The Second Wuhu Yangtze River Bridge: A Cable-Stayed Bridge with a U-Shape Anchoring System
Author(s): |
Zuqiao Ma
(Anhui Transportation Holding Group Co., LTD., Hefei, People''s Republic of China; PhD Candidate, Department of Bridge Engineering, Tongji University, Shanghai, People’s Republic of China)
Ke Hu (Anhui Transportation Holding Group Co., LTD., Hefei, People’s Republic of China) Xuefei Shi (Department of Bridge Engineering, Tongji University, Shanghai, People’s Republic of China) Hongshan Pan (Department of Bridge Engineering, Tongji University, Shanghai, People’s Republic of China) Zhiquan Liu (Shanghai BRIDGING Engineering Consulting Co., Ltd, Shanghai, People’s Republic of China.) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Structural Engineering International, February 2023, n. 1, v. 33 |
Page(s): | 1-6 |
DOI: | 10.1080/10168664.2021.1978367 |
Structures and Projects
- About this
data sheet - Reference-ID
10635923 - Published on:
30/11/2021 - Last updated on:
08/06/2023