0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Second time around

Precast abutment blocks and railway trucks are being combined to make short-span bridges

Author(s):

Medium: journal article
Language(s): English
Published in: Bridge Design & Engineering, , n. 55, v. 15
Page(s): 78
Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10048578
  • Published on:
    06/12/2009
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine