Second Remediation of Long-Term Deflection and Cracking of PT Box-Girder Bridge Using External Post-Tensioning
Author(s): |
Xuhui Zhang
Shuang Li Wei Zhang Ogwu Ikechukwu Lizhao Dai Lei Wang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Performance of Constructed Facilities (ASCE), October 2020, n. 5, v. 34 |
Page(s): | 04020090 |
DOI: | 10.1061/(asce)cf.1943-5509.0001491 |
- About this
data sheet - Reference-ID
10426420 - Published on:
13/07/2020 - Last updated on:
13/07/2020