Scrutinizing the Adoption of Integrated Project Delivery in the Kingdom of Saudi Arabia Construction Sector

Author(s): ORCID


ORCID
ORCID
Medium: journal article
Language(s): English
Published in: Buildings, , n. 12, v. 12
Page(s): 2144
DOI: 10.3390/buildings12122144
Abstract:

The Integrated Project Delivery (IPD) approach has been acquiring applause worldwide attributable to its certified and attested outcomes in efficiently sharing threats and costs confronting the construction project. Regardless of its popularity and rationality, no substantial studies have been conducted into the Kingdom of Saudi Arabia’s (KSA) construction. Hence, the novelty of this paper is probing the Saudi Arabia government tender process and procurement regulation for IPD theme deployment, reliant on a thorough literature assessment to bestow construction parties with the barriers of incorporating the IPD paradigm in KSA. The research objectives are attained via a questionnaire survey steered toward (1) pondering respondents’ cognizance of IPD eventuality and deployment in the KSA’s construction sector, (2) stipulating the survey’s participants’ preparedness for IPD implementation in KSA’s construction market, (3) specifying the project phase in which the contractor should be entangled as part of the IPD method, and (4) scrutinizing the respondents’ knowledge to classify the anticipated barriers to IPD from the global market in KSA. Findings unearth that the KSA construction sector still entails being more conscientious and adequate, pointing out the difficulties triggered by a dearth of awareness, apprehension, and pragmatic implementation. Further, respondents showed impartiality towards construction project stakeholders’ prescience and exuberance, the existing government procurement and tendering laws, and revolutionary technological infrastructure and competency for IPD implementations in the KSA construction industry. Additionally, the contractor should be implicated and embroiled in the construction project from the early design phase. Addedly, the hurdles to deploying IPD in KSA are ranked as follows: technological, knowledge, financial, legal, and cultural barriers.

Copyright: © 2022 by the authors; licensee MDPI, Basel, Switzerland.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10700125
  • Published on:
    11/12/2022
  • Last updated on:
    10/05/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine