Schematic study on temperature control and crack prevention during spillway tunnel concreting period
Author(s): |
Zhenhong Wang
Yi Liu Guoxin Zhang Wenqian Hou |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Materials and Structures, November 2015, n. 11, v. 48 |
Page(s): | 3517-3525 |
DOI: | 10.1617/s11527-014-0418-0 |
- About this
data sheet - Reference-ID
10171524 - Published on:
11/12/2018 - Last updated on:
11/12/2018