0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Scheduling Optimization of Prefabricated Buildings under Resource Constraints

Author(s): ORCID
ORCID
ORCID
Medium: journal article
Language(s): English
Published in: KSCE Journal of Civil Engineering, , n. 12, v. 25
Page(s): 4507-4519
DOI: 10.1007/s12205-021-0444-8
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s12205-021-0444-8.
  • About this
    data sheet
  • Reference-ID
    10624641
  • Published on:
    26/08/2021
  • Last updated on:
    29/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine