Scheduling of Job Resources in Multiunit Projects with the Use of Time I Cost Criteria

Author(s):
Medium: journal article
Language(s): English
Published in: Archives of Civil Engineering, , n. 1, v. 62
Page(s): 143-158
DOI: 10.1515/ace-2015-0057
Abstract:

This paper presents a model of scheduling of multiunit construction project based on an NP-hard permutation flow shop problem, in which the considered criterion is the sum of the costs of the works’ execution of the project considering the time of the project as a constraint. It is also assumed that each job in the units constituting the project may be realized in up to three different ways with specific time and cost of execution. The optimization task relies on solving the problem with two different decision variables: the order of execution of units (permutation) and a set of ways to carry out the works in units. The task presented in the paper is performed with the use of a created algorithm which searches the space of solutions in which metaheuristic simulated annealing algorithm is used. The paper presents a calculation example showing the applicability of the model in the optimization of sub-contractors’ work in the construction project.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1515/ace-2015-0057.
  • About this
    data sheet
  • Reference-ID
    10476868
  • Published on:
    25/11/2020
  • Last updated on:
    25/11/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine