0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Schedule Risk Analysis using a Proposed Modified Variance and Mean of the Original Program Evaluation and Review Technique Model

Author(s):

Medium: journal article
Language(s): English
Published in: KSCE Journal of Civil Engineering, , n. 4, v. 23
Page(s): 1484-1492
DOI: 10.1007/s12205-019-1826-z
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s12205-019-1826-z.
  • About this
    data sheet
  • Reference-ID
    10291978
  • Published on:
    29/06/2019
  • Last updated on:
    29/06/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine