0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Sand Deposit Arrangement and Construction Optimization for Large-section Immersed Tube Tunnel Foundations via the Sand Flow Method

This publication lists 13 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10216172
  • Published on:
    06/12/2018
  • Last updated on:
    06/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine