0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Safe passage of TBM under new NEL tunnels, using a foam grout backfilled advance tunnel

Medium: journal article
Language(s): English
Published in: Tunnelling and Underground Space Technology, , n. 4-5, v. 19
Page(s): 353-354
DOI: 10.1016/j.tust.2004.01.046
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.tust.2004.01.046.
  • About this
    data sheet
  • Reference-ID
    10126950
  • Published on:
    01/12/2018
  • Last updated on:
    01/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine