0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Root Cause of Cost Overrun Risks in Public Sector Social Housing Programs in SIDS: Fuzzy Synthetic Evaluation

This publication has been cited in the following 2 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10734623
  • Published on:
    03/09/2023
  • Last updated on:
    03/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine