Rockburst Hazard Control Using the Excavation Compensation Method (ECM): A Case Study in the Qinling Water Conveyance Tunnel
Author(s): |
Jie Hu
Manchao He Hongru Li Zhigang Tao Dongqiao Liu Tai Cheng Di Peng |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, March 2024, v. 34 |
Page(s): | 154-163 |
DOI: | 10.1016/j.eng.2023.11.013 |
- About this
data sheet - Reference-ID
10776601 - Published on:
12/05/2024 - Last updated on:
20/09/2024