0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A Robust Bi-objective Optimization Model for Resource Levelling Project Scheduling Problem with Discounted Cash Flows

Author(s): ORCID
ORCID
Medium: journal article
Language(s): English
Published in: KSCE Journal of Civil Engineering, , n. 6, v. 26
Page(s): 2539-2554
DOI: 10.1007/s12205-022-0679-z
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s12205-022-0679-z.
  • About this
    data sheet
  • Reference-ID
    10663448
  • Published on:
    09/05/2022
  • Last updated on:
    27/05/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine