0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Roadworks Warning—Closure of a Lane, the Impact of C-ITS Messages

Author(s): ORCID
ORCID
ORCID
ORCID

Medium: journal article
Language(s): English
Published in: Infrastructures, , n. 3, v. 5
Page(s): 27
DOI: 10.3390/infrastructures5030027
Abstract:

By now, it is widely acknowledged among stakeholders and academia that infrastructures will have to be composed both by a physical component and a digital one. The deployment of technologies exploiting dedicated short_range communications is viewed as the most cost-effective solution to face the foreseen growth of mobility. Still, little has been done to define the best implementation logic of DSRC. Aim of this paper is to frame the possible impacts arising by the implementation of a cooperative intelligent transport system (C-ITS)-use case: roadworks warning—closure of a lane, and, in order to achieve this result, microsimulations are exploited. The results are intended to support both road operators and car-makers in defining the best operational logics and the possible benefits achievable by presenting the cooperative message at a certain distance for certain market penetrations. Moreover, if the C-ITS message actually entails benefits or simply disrupts the upstream traffic should be assessed in advance, before implementing the system. The obtained results show that the risk of disruption and of reduction in traffic efficiency arises at lower market penetration levels. Nevertheless, a consistent trend in delay reduction is recorded upstream the roadworks, the highest reduction being equal to 8.66%. Moreover, the average speed at the roadworks entrance on the closing lane increases by a difference equal to around 10 km/h, while the average time in the queue at the highest market penetration reduces by 60 s on the open lane and 25 s on the closing one. These presented results reflect the way the traffic shifts from the slow to the fast lane thanks to the C-ITS system and effectively frames both the potentialities and the risks of the system.

Copyright: © 2020 the Authors. Licensee MDPI, Basel, Switzerland.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10723215
  • Published on:
    22/04/2023
  • Last updated on:
    10/05/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine