The Road Steel Bridge Over Bosut River in Serbia Part 2 – Repair and Reconstruction
Author(s): |
Vlastimir Radonjanin
Đorđe Lađinović Dušan Kovačević Mirjana Malešev Andrija Rašeta Radoslav Lekić |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Procedia Engineering, 2016, v. 156 |
Page(s): | 380-387 |
DOI: | 10.1016/j.proeng.2016.08.311 |
- About this
data sheet - Reference-ID
10669755 - Published on:
28/05/2022 - Last updated on:
28/05/2022