A Risk Management System for Deep Excavation Based on BIM-3DGIS Framework and Optimized Grey Verhulst Model
Author(s): |
Pin-Chan Lee
Li-Long Zheng Tzu-Ping Lo Dan-Bing Long |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | KSCE Journal of Civil Engineering, February 2020, n. 3, v. 24 |
Page(s): | 715-726 |
DOI: | 10.1007/s12205-020-1462-7 |
- About this
data sheet - Reference-ID
10412261 - Published on:
13/02/2020 - Last updated on:
25/02/2020