0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Risk factors affecting the performance of public works construction projects in developing countries: a case study of Lebanon

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1504/ijmri.2025.142989.
  • About this
    data sheet
  • Reference-ID
    10809484
  • Published on:
    17/01/2025
  • Last updated on:
    17/01/2025
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine