0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Risk-aware day-ahead planning of an energy hub integrated with the carbon capture unit considering cap and trade concept, energy and carbon markets and demand side flexibility

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.scs.2024.105313.
  • About this
    data sheet
  • Reference-ID
    10775536
  • Published on:
    29/04/2024
  • Last updated on:
    29/04/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine