Risk Assessment of Small-Diameter Shield Construction in a Deep Drainage Tunnel Based on an ISM–CRITIC–Cloud Model
Author(s): |
Kai Hu
Junwu Wang Danhong Wu Yingang Wang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Buildings, 18 December 2024, n. 12, v. 14 |
Page(s): | 3920 |
DOI: | 10.3390/buildings14123920 |
Abstract: |
The deep drainage tunnel project is an important measure to alleviate urban waterlogging. The construction of a deep drainage tunnel is a complicated process, involving many influencing factors, and there are correlations among these influencing factors, so the risk assessment is difficult. In this study, the ISM method, CRITIC method and cloud model are combined to build a risk assessment model for the small-diameter shield construction of a deep drainage tunnel. Firstly, the risk index system of small-diameter shield construction in a deep drainage tunnel is put forward. Secondly, the ISM method is used to divide the risk indicators and extract the key risk factors. Then, these key risk factors are weighted with the CRITIC method, and the cloud model is used to evaluate the construction risk of a small-diameter shield of a deep drainage tunnel. Finally, the feasibility and accuracy of the proposed method are verified by a practical case. It was found that the risk assessment method proposed in this study can not only effectively assess the level of security risk, but also identify the key risk factors and rank the importance of these factors. The results of this study can reduce the interference items and workload of risk assessment to a certain extent, and help provide managers with an accurate decision-making basis. |
Copyright: | © 2024 by the authors; licensee MDPI, Basel, Switzerland. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
1.79 MB
- About this
data sheet - Reference-ID
10810605 - Published on:
17/01/2025 - Last updated on:
17/01/2025