0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Risk Assessment Model for Optimal Gain–Pain Share Ratio in Target Cost Contract for Construction Projects

This publication has been cited in the following 11 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10636704
  • Published on:
    30/11/2021
  • Last updated on:
    30/11/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine