Risk Assessment Method for the Safe Operation of Long-Distance Pipeline Stations in High-Consequence Areas Based on Fault Tree Construction: Case Study of China–Myanmar Natural Gas Pipeline Branch Station
Author(s): |
Jiarui Xu
Fengshan Jiang Zhiqiang Xie Guofang Wang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, March 2023, n. 1, v. 9 |
DOI: | 10.1061/ajrua6.rueng-960 |
- About this
data sheet - Reference-ID
10701869 - Published on:
11/12/2022 - Last updated on:
11/12/2022