0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A risk allocation model among the elements of freeway projects in public-private partnership (PPP) method using integrated fuzzy multi-criteria decision-making techniques

Author(s): ORCID (Department of Civil Engineering, Dariun Branch, Islamic Azad University, Dariun, Iran)
(Department of Civil Engineering, Rodehen Branch, Islamic Azad University, Rodehen, Iran)
(Department of Civil Engineering, Safadasht Branch, Islamic Azad University, Safadasht, Iran)
Medium: journal article
Language(s): English
Published in: Australian Journal of Civil Engineering, , n. 1, v. 21
Page(s): 1-25
DOI: 10.1080/14488353.2022.2083288
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/14488353.2022.2083288.
  • About this
    data sheet
  • Reference-ID
    10679272
  • Published on:
    18/06/2022
  • Last updated on:
    01/04/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine