0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Review and Survey of 4D Simulation Applications in Forensic Investigation of Delay Claims in Construction Projects

This publication has been cited in the following 3 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10580049
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine