Retrofitting in the Middle of Project Execution: Case Study of a Public Hospital Building
Author(s): |
Ferry Hermawan
Himawan Indarto Robby Soetanto |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Procedia Engineering, 2017, v. 171 |
Page(s): | 323-332 |
DOI: | 10.1016/j.proeng.2017.01.340 |
- About this
data sheet - Reference-ID
10669500 - Published on:
18/06/2022 - Last updated on:
18/06/2022