Retaining walls, ground improvement works and monitoring for the new high-speed railway station in Bologna / Verbauwände, Bodenverbesserungsmaßnahmen und Monitoring für einen neuen Bahnhof für Hochgeschwindigkeitszüge in Bologna
Author(s): |
Stefano Ciufegni
Francesco Sacchi Luca Utzeri |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2012, n. 3, v. 5 |
Page(s): | 261-274 |
DOI: | 10.1002/geot.201200019 |
Abstract: |
The new Bologna high-speed railway station extends approximately 640 m underground, with a width of 56 m and a depth of 25 m. The open-cut excavation work to complete the underground station was designed using an innovative structural system, which entails the construction of reinforced concrete diaphragm walls with unusual shape and structural behaviour. Vaults, diaphragm walls with an arched section, were constructed to absorb the thrust actions. Buttresses, T-section diaphragm walls were designed to absorb actions through flexural behaviour transmitted by the vaults. |
Keywords: |
diaphragm walls vaults ground improvement vault underground railway station buttresses cutter soil mixing (CSM)
|