0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Results of the Application of Horse Power to Raising Water from the Working Shafts at Saltwood Tunnel, on the South-Eastern Railway, in 1842

Author(s):
Medium: journal article
Language(s): English
Published in: Minutes of the Proceedings of the Institution of Civil Engineers, , n. 1843, v. 2
Page(s): 112-114
DOI: 10.1680/imotp.1843.24642
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/imotp.1843.24642.
  • About this
    data sheet
  • Reference-ID
    10162372
  • Published on:
    02/01/2019
  • Last updated on:
    02/01/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine