0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Resource Management of Bridge Deck Rehabilitation: Jacques Cartier Bridge Case Study

Author(s):


Medium: journal article
Language(s): English
Published in: Journal of Construction Engineering and Management, , n. 5, v. 134
Page(s): 311-319
DOI: 10.1061/(asce)0733-9364(2008)134:5(311)

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)0733-9364(2008)134:5(311).
  • About this
    data sheet
  • Reference-ID
    10164014
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine