0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Resource leveling in construction projects with activity splitting and resource constraints: a simulated annealing optimization

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1139/cjce-2017-0670.
  • About this
    data sheet
  • Reference-ID
    10299328
  • Published on:
    06/02/2019
  • Last updated on:
    21/02/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine