0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Research on the Application of Multi-Source Data Analysis for Bridge Safety Monitoring in the Reconstruction and Demolition Process

Author(s):
ORCID

ORCID

Medium: journal article
Language(s): English
Published in: Buildings, , n. 8, v. 12
Page(s): 1195
DOI: 10.3390/buildings12081195
Abstract:

With the increase of bridge-required demolition/dismantling for reconstruction or modification, the early warning of construction emergencies is greatly needed for monitoring the structural safety of bridges under construction. In this paper, based on the multi-source data of nearby construction and demolition construction of a large-span RC arch bridge in China, the Analytic Hierarchy Process (AHP) method is adopted to analyze the multi-source data and set the early warning threshold for bridge safety in construction. According to the analytical results, a reasonable evaluation of AHP factors can improve the accuracy and timeliness of safety early warning in the structural safety monitoring of bridges during the construction process. The weight of the monitoring data in AHP should be assigned according to its reliability, stability, and importance. Bridge safety assessment of nearby construction having harmful vibration should prioritize dynamic bridge monitoring by cooperating with multi-source data, including stress, and deformation monitoring of the bridge is necessary. The assessment results proved that multi-source data, including but not limited to structural stress and deformation monitoring data, vibration data, theoretical prediction data, environment data such as temperature data, and construction/maintenance history data, are necessary for safety monitoring and early warning of construction with specifications related to bridge construction. The early warnings triggered by the evaluation results successfully ensure the safety status of the bridge during nearby construction and demolition construction, which shows the proposed method can provide a guideline for comprehensively evaluating and early warning of the status of bridge construction.

Copyright: © 2022 by the authors; licensee MDPI, Basel, Switzerland.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10688686
  • Published on:
    13/08/2022
  • Last updated on:
    10/11/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine