0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

南阁大桥双索面斜拉桥拆除方案及监控方法研究 (Research on Demolition Scheme and Monitoring Method for Cable-Stayed Bridge with Double Cable Plane of Nange Bridge)

Author(s):
Medium: journal article
Language(s): Chinese
Published in: Hans Journal of Civil Engineering 的中文名称是土木工程, , n. 1, v. 8
Page(s): 124-130
DOI: 10.12677/hjce.2019.81016

Structure Types

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.12677/hjce.2019.81016.
  • About this
    data sheet
  • Reference-ID
    10378262
  • Published on:
    12/11/2019
  • Last updated on:
    12/11/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine