0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Required accuracy of information when determining optimal railway intervention programmes

Author(s): ORCID (Institute of Construction and Infrastructure Management, ETH Zurich, Zurich, Switzerland)
(Infrastructure Management Group, Institute of Construction and Infrastructure Management, ETH Zurich, Zurich, Switzerland)
Medium: journal article
Language(s): English
Published in: Infrastructure Asset Management, , n. 1, v. 9
Page(s): 1-10
DOI: 10.1680/jinam.20.00032
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/jinam.20.00032.
  • About this
    data sheet
  • Reference-ID
    10614003
  • Published on:
    09/07/2021
  • Last updated on:
    23/03/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine