0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Replanteamiento de la planificación de proyectos mineros: uso de nasa-tlx para medir una novedosa integración entre otsm-triz y DSM

Author(s):
ORCID
ORCID
ORCID
Medium: journal article
Language(s): Spanish
Published in: DYNA, , n. 6, v. 99
Page(s): 579-584
DOI: 10.52152/d11312
Abstract:

This research introduces an integrated methodology combining OTSM-TRIZ and the Design Structure Matrix (DSM) to enhance project planning and risk management in mining projects. OTSM-TRIZ, through a Network of Problems (NoP), systematically addresses complex challenges, while DSM analyzes task dependencies, optimizing resource allocation and sequencing. Applied in a real-world Chilean mining company with over 120 workers, the methodology improved outcomes by reducing trial-and-error iterations and boosting efficiency. Workers gained valuable insights into managing project complexity. NASA-TLX was used to explore usefulness authors’ proposal. Keywords: Mining Projects, OTSM-TRIZ, DSM, NASA-TLX

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.52152/d11312.
  • About this
    data sheet
  • Reference-ID
    10806406
  • Published on:
    10/11/2024
  • Last updated on:
    10/11/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine