0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Reparación de pilares en los bloques 42, 45 y 46 del barrio de Las Flores en La Coruña. Proyecto hecho para el IGVS de la Xunta de Galicia

Author(s):
Medium: journal article
Language(s): English, Spanish
Published in: Hormigón y acero, , n. 178, v. 42
Page(s): 111-116
Abstract:

How to repair some columns in which the carbonation and chloride starts the reinforcement corrosion

This paper explains how to repair some columns of several buildings existing in La Coruña. The work contains how reinforcement corrosion can crack concrete and advises on remedial action. Two systems of reinforcement are used. In the weakest columns a metallic hoop is used. The others were repaired using an increased concrete cover tied with shear connectors to the existing columns. The novelity of this method is to employ mortars with high resistance, up to 20000 psi. It allows to bind the shear connectors to the old concrete with small lengths.

Available from: ACHE - Asociación Española de Ingeniería Estructural
Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10076267
  • Published on:
    27/02/2019
  • Last updated on:
    27/02/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine