0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Remedial Measures on the Arapuni Hydro-Electric Scheme of Power Development on the Waikato River, New Zealand

Author(s):

Medium: journal article
Language(s): English
Published in: Minutes of the Proceedings of the Institution of Civil Engineers, , n. 1935-2, v. 240
Page(s): 411-455
DOI: 10.1680/imotp.1935.15249

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/imotp.1935.15249.
  • About this
    data sheet
  • Reference-ID
    10175684
  • Published on:
    02/01/2019
  • Last updated on:
    02/01/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine