0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Relationship between Cost Overruns and Modifications for Construction Projects: Spanish Public Works and Their Legal Framework

This publication lists 59 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10744446
  • Published on:
    28/10/2023
  • Last updated on:
    07/02/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine